Skip to content
Phone: 541.338.9488 Contact Us 325 West 13th Avenue • Eugene, OR 97401

Tenant Improvement Engineer in Eugene

New tenant, new layout, new equipment — and usually a building department that wants an engineer involved. Tenant improvements (TIs) are on the list of projects that trigger the need for an engineer in Oregon. Johnson Broderick Engineering is a tenant improvement engineer in Eugene working for owners, tenants, contractors and architects on commercial space.

FM Sheetmetal industrial building structural engineering project, Eugene, Oregon — photo 1

What a TI can involve

  • New openings in load-bearing walls and the headers, posts and footings they need
  • Added load — new equipment or heavier storage. An alteration that increases the load on a gravity element by 5% or more, or on a lateral element by 10% or more, needs an engineer.
  • Change of use or occupancy — a building going from one use to another can bring new structural, egress and accessibility requirements
  • Egress — verifying exit paths, and designing egress stairs where needed (Building Envelope, Egress & ADA)
  • ADA — accessibility review, design and detailing
  • Seismic upgrades where the scope of work calls for them

Repurposing existing buildings

Some TIs are buildings that end up doing something new. We assisted Gary Simantel, Architect, in repurposing a large industrial building into new offices and a production facility for FM Sheetmetal. We helped with the structural work needed to turn an older house into Vero Coffee House.

Why due diligence matters on a TI

Clients tell us they value how thoroughly we dig in up front to find hidden problems before they turn into a nasty surprise during design or construction. On a TI with a lease date or an opening date attached, finding the problem in week one instead of week eight is what keeps the schedule.

We also keep an eye on the gap between what looks fine and what the code requires. A header that has never moved may still not satisfy the building code, and the building department reviewing your TI won’t let it slide. We design to code as a minimum and tell you plainly when something needs to change.

Common questions

Does my tenant improvement need an engineer?

Tenant improvements are on the list of work that calls for an engineer in Oregon. So are openings in load-bearing walls and alterations that increase gravity loads by 5% or more or lateral loads by 10% or more. If you’re unsure, call us and describe the work — we’re always willing to talk it through. See our guide Do I Need a Structural Engineer in Oregon?

Our designer drew the TI plans. Can you stamp them?

No — Oregon law doesn’t allow us to stamp plans prepared by someone else. Unstamped designer plans tend to get kicked out of review, and in many cases the design has to be re-engineered. It’s usually cheaper to start with a licensed design professional. More in Why Designer Plans Get Rejected at Permit Review.

We're on a tight deadline. Can you help?

We’ll tell you honestly what’s achievable. Small projects can turn around in two to three weeks, and we give you milestone dates and regular updates. When a schedule goes sideways during construction, we step in: on one recent smallish project, a subcontractor’s inexperience with special inspections surfaced on a Thursday with completion due Monday. We directed the design modifications to fit the schedule and inspections, and by the end of Friday the path was clear.

Related projects

Long side of a one-story tan office building with a band of dark windows above landscaped shrubs, Eugene

Siletz Tribal Office Remodel

Eugene: Permit drawings to reclad, re-window and update an office building for the Confederated Tribes of Siletz Indians, approved by the City in under three weeks.

Weathered wood-sided building with a covered porch and railing along the street in downtown Veneta

Veneta Food Truck Plaza Dining Hall

Veneta: Repairing rot-damaged floor framing and permitting an older wood-framed building in phases so it can serve as indoor dining for a food truck plaza.

Coos Bay Hall Building egress stair structural engineering project, Eugene, Oregon — photo 3

Coos Bay Hall Building – Egress Stair

Coos Bay: a new five-floor steel egress stair tower for the 1928 Hall Building, on drilled piles through about 100 feet of bay mud to bedrock.

Steel-framed canopy over a grocery store loading dock against a tan masonry wall

Market of Choice Loading Dock Canopy

Eugene: A steel moment-frame expansion of a grocery store’s loading dock canopy, designed for snow drift and joined to the existing structure, completed in 2020.

Gutted interior of the former department store at Valley River Center before the seismic upgrade

Valley River Center Seismic Upgrade Inspection

Eugene: special inspection of micropiles, shotcrete walls, welding and post-tensioning on the seismic upgrade of a former department store.

Steel frame of the KVAL TV studio addition under construction in Eugene, Oregon

KVAL TV Studio Addition, Eugene

Structural and civil engineering for a studio and workspace addition at the KVAL broadcast facility in Eugene, Oregon.

Start your TI

Call 541-338-9488 or email info@jbe.us.com with the floor plan, lease exhibit, photos or any existing drawings attached. We return every new inquiry the same day if possible, or by the next business day.

Call 541-338-9488 Contact us
Back To Top