Coos Bay Hall Building: Egress Stair Design on Drilled Piles in Coos Bay, Oregon

  • Location: Hall Building, downtown Coos Bay, Oregon
  • Client/Owner: Clean Rivers Erosion Control (contractor)
  • Partners: SHN (geotechnical); Stelcor (drilled piles)
  • Year: Designed 2022–2024; built 2025–2026; completed March 2026
  • Size/scale: Steel stair tower serving five floors and the roof; four drilled piles through about 100 feet of bay mud to bedrock
  • JBE services: Structural design of the new egress stair tower, its foundation and the interior egress path at each floor; temporary egress coordination; construction administration and structural observation
  • Sector: Commercial & Retail
Coos Bay Hall Building egress stair structural engineering project, Eugene, Oregon — photo 3

The challenge

The Hall Building is a historic 1928 building in downtown Coos Bay. Its original fire escape had deteriorated to the point of being structurally unsafe, and it had no stair from its lowest level down to grade, so occupants could be left stranded in an emergency. The building official directed the owner to provide a safe, code-compliant way out from every floor.

The ground was the hard part. The site sits on about 8 feet of old dredge-spoil fill over roughly 100 feet of soft bay mud, with bedrock at around 120 feet. The building’s own foundation is unknown — like its neighbours, it likely sits on untreated timber piles — and it shows the cracking and settlement typical of buildings on these soils. A new stair tower couldn’t simply sit on that ground.

Project photos

What we did

We designed a new steel stair tower on the north side of the building, plus a retrofit of the common space on each floor to give an interior egress path that leads out to the new stair and down to the public right of way. We also helped coordinate temporary egress so the building could stay in use during construction.

A geotechnical boring by SHN went the full 120 feet to bedrock. Based on it, we founded the stair on four drilled piles carrying a 24-inch concrete mat slab with grade beams. The tower itself is built from steel HSS columns and beams, with galvanized hardware, tied back to the building at each floor.

Through construction we reviewed shop drawings, answered contractor RFIs and made structural observations on site, solving field issues as they came up — relocated base plates, a repair to misdrilled shear tabs, epoxy anchorage where concrete floors turned up behind the walls, and the parapet cut for roof access.

The result

Construction was completed in March 2026, when the stair was handed over to the building owner. The Hall Building now has a stable stair tower that gives occupants a safe, code-compliant way out of every floor in an emergency. It adds value to a historic structure, and it’s the kind of egress stair design in Coos Bay, Oregon — and on the coast generally — where the ground conditions matter as much as the stair itself.

Related projects

Weathered wood-sided building with a covered porch and railing along the street in downtown Veneta

Veneta Food Truck Plaza Dining Hall

Veneta: Repairing rot-damaged floor framing and permitting an older wood-framed building in phases so it can serve as indoor dining for a food truck plaza.

Long side of a one-story tan office building with a band of dark windows above landscaped shrubs, Eugene

Siletz Tribal Office Remodel

Eugene: Permit drawings to reclad, re-window and update an office building for the Confederated Tribes of Siletz Indians, approved by the City in under three weeks.

Steel-framed canopy over a grocery store loading dock against a tan masonry wall

Market of Choice Loading Dock Canopy

Eugene: A steel moment-frame expansion of a grocery store’s loading dock canopy, designed for snow drift and joined to the existing structure, completed in 2020.

Gutted interior of the former department store at Valley River Center before the seismic upgrade

Valley River Center Seismic Upgrade Inspection

Eugene: special inspection of micropiles, shotcrete walls, welding and post-tensioning on the seismic upgrade of a former department store.

Steel frame of the KVAL TV studio addition under construction in Eugene, Oregon

KVAL TV Studio Addition, Eugene

Structural and civil engineering for a studio and workspace addition at the KVAL broadcast facility in Eugene, Oregon.

JNB Trucking industrial structural engineering project, Eugene, Oregon — photo 1

JNB Trucking

Eugene: a new wood-framed office headquarters with exposed glulam framing and skylights over a central vaulted space.

Back To Top