International Paper Recycling Facility in Springfield, Oregon

  • Location: Springfield, Oregon
  • Client/Owner: International Paper, Eugene recycling operation
  • Partners: Geotechnical engineer (Phase II foundations); ground-penetrating radar survey of the existing slab; City of Springfield (site plan review)
  • Year: 2017–2019
  • Size/scale: Recycling operation moved into an existing large-span warehouse about 241 feet wide (six 40-foot bays)
  • JBE services: Programming, existing-slab investigation, structural design and permit drawings in two phases, Type II site plan review, stormwater verification letter, construction-phase support
  • Sector: Industrial
Large-span warehouse interior in Springfield, Oregon, being fitted out as a recycling facility

The challenge

International Paper was moving its Eugene recycling operation into an existing warehouse in Springfield. A recycling line is heavy equipment on a tight schedule. The balers, conveyors and sorter all need foundations, and the trucks and loaders that feed them need walls that can take a beating.

The building was already standing, with an industrial slab of unknown makeup and existing column footings in the way. Before anything could be designed, we had to know what was under the floor and how much of it could stay.

Project photos

What we did

We started by mapping the existing slab and footings with a ground-penetrating radar survey. It showed the slab thickness varied from 6 to 8 inches, and it located the reinforcing and footings around the planned equipment.

Phase I, issued for permit in September 2017, covered the demolition plan, a new baler in-feed conveyor pit with 7- and 10-foot concrete pit walls, replacement of the existing column footings that the excavation undercut, 8-inch slab infill where the floor was cut, and reinforced concrete U-walls for the material bays. A column revision followed in November 2017. Phase II, issued in December 2017, added the sorter foundation and the foundation for a modular office.

We also prepared the Type II site plan review for the City of Springfield. In 2019 we verified for the City that the as-built stormwater swale along the east edge of the site met its design standard. The swale’s treatment ratio came out at 0.12 against a required 0.11.

The result

The recycling operation moved into Springfield. The building was fitted for the equipment it now carries, with the conveyor pit, push walls and foundations designed around the existing slab and footings. The site improvements were signed off against the City’s stormwater requirements.

Related projects

Manufacturing floor with autoclaves inside a light-manufacturing plant in Springfield, Oregon

Rosen Sunvisor Systems Storage Addition

Springfield: A pre-engineered steel storage addition to a 37,000 sq ft manufacturing plant, with a hidden wall-panel problem found and repaired during construction.

Metal-clad former sawmill building near Cottage Grove, Oregon

Sawmill Building Truck Shop Conversion

Cottage Grove: A 90,000 sq ft former sawmill building scanned and assessed, then partly converted and permitted as a truck repair shop.

Bartels Packing plant near Eugene, Oregon, at dusk during a site survey

Bartels Packing Plant Expansion, Eugene

Structural design for two additions to an operating meat packing plant near Eugene, Oregon.

QSL Printing structural engineering project, Eugene, Oregon

QSL Printing

Springfield: a concrete mat foundation for a six-unit Heidelberg press, held well inside the manufacturer’s deflection limit.

FM Sheetmetal industrial building structural engineering project, Eugene, Oregon — photo 1

FM Sheetmetal

Springfield: structural work to move a sheet metal fabricator into an existing metal building — offices with a storage loft, a removed post and a new awning.