Hayward Field Finish Line Truss: Anchorage Engineering for the Eugene Marathon

  • Location: Hayward Field, Eugene, Oregon
  • Client/Owner: Wilson Sound and Light (event staging) — for the 2025 Eugene Marathon
  • Partners: City of Eugene Planning and Development (temporary structure permit)
  • Year: 2025
  • Size/scale: Temporary 12-inch box truss spanning up to 47 feet across the finish line; a second truss up to 42 feet at the start
  • JBE services: Structural engineering — wind loading, ballast and guy anchorage design, permit drawings and calculations, operations and high-wind plan, review of field changes
  • Sector: Public, Civic & Education
Hayward Field track and field structural engineering project, Eugene, Oregon — photo 3

The challenge

The 2025 Eugene Marathon finished inside historic Hayward Field. A temporary box truss carrying signage had to stand over the finishing runners, and a second one marked the start outside the stadium. The trusses themselves were engineered by others; our job was to keep them in place.

That meant no anchors into the ground. The towers had to sit on the track and infield surface, carry wind on the truss and its signage, and get through the City of Eugene’s permit for temporary structures — all in the few weeks before race day.

Project photos

What we did

We calculated site-specific wind loads to the codes for temporary event structures, then designed the anchorage around ballast. Each tower stands on a base plate over a rubber mat with outriggers on all four sides, and each end of the truss is guyed with aircraft cable and turnbuckles to water-tote ballast sized for the load. We prepared the permit drawings and calculations, answered the city’s plan review comments, and wrote an operations plan with daily checks and a high-wind action plan for the length of the event.

When the original ballast layout at the finish line wouldn’t fit the space around the truss, the installer rearranged it. We reviewed the new arrangement in the final days before the race, confirmed it still exceeded the weight required, and signed off.

The result

Thousands of runners finished under the truss, including our own Brodie Davis and his wife Sarah, who ran the race. The anchorage did its job without anyone noticing it, which is the point. Like a lot of good structural engineering, you don’t notice it — by design.

We’re proud to have contributed a safe, stable anchorage design to the finish of this iconic race, and it’s a good example of the smaller, event-driven Hayward Field structural engineering work we’re glad to take on.

Related projects

Convention center roof at the Lane Events Center in Eugene during the 2020 reroof

Lane Events Center Roof Deck Repair

Eugene: during the Lane Events Center reroof, we assessed rust-damaged steel roof deck and designed in-kind replacement details that kept the project moving.

LED light pole structural design project, Sisters, Oregon — photo 5

LED Light Poles for Sisters, Oregon

Sisters: steel connections and a structural check for custom laminated wood LED light poles, with Sternberg Lighting and J.H. Baxter & Co.

Retrofitted three-story steel fire escape on the brick and shingle Center for Teaching and Learning, Eugene

Northwest Christian University Fire Escape Retrofit

Eugene: assessment, retrofit design and Fire Marshal certification of decades-old steel fire escapes on a former Greek house converted for university use.

Oak Hill School structural engineering project, Eugene, Oregon — photo 2

Oak Hill School

Eugene: a 5,259 sq ft wood-framed school building, with civil and structural design, built over the summer of 2013.