Dead Mountain Tower Site Development near Westfir, Oregon

  • Location: Dead Mountain, near Westfir and Oakridge, Oregon
  • Client/Owner: Woods Communications
  • Partners: U.S. Forest Service and Lane County (permitting); geotechnical engineer
  • Year: 2025–2026, in permitting
  • Size/scale: New 100-foot self-supporting tower, equipment shelter on a slab on grade, and supporting site work
  • JBE services: Survey and existing conditions, programming and site design, land use approval, Forest Service coordination, permit documents; construction administration to follow
  • Sector: Towers & Telecom
The existing tower compound and microwave dish on Dead Mountain near Westfir, Oregon

The challenge

The site is a forested bluff on the west side of Dead Mountain, above Westfir, where a small existing compound holds an equipment building and a short tower carrying a microwave dish and an omnidirectional antenna. The new development has to fit beside it: a 100-foot self-supporting tower, a new equipment shelter and the work that goes with them.

Getting there takes more than structural design. The site is remote and steep, the access is rough and, in winter, under snow. The project needs land use approval from Lane County and coordination with the U.S. Forest Service, including fire break requirements.

Project photos

What we did

We started with information gathering: a site survey, utility research and repeated site visits to map the existing compound and the constraints around it. From that we prepared an existing conditions plan, worked with the client on a programming session to define the new compound, and produced the site plan.

We are carrying the project through land use review with Lane County and coordination with the Forest Service, including fire break planning and the submittal of the special use application and drawing set with the geotechnical work. Permit documents for the tower and shelter follow, and we will provide construction administration once construction begins.

The result

The project was in U.S. Forest Service review as of late summer 2026. The new site will give the area a taller, purpose-built tower beside the existing compound, planned from the ground up around the site’s survey, access and approval requirements.

Related projects

Wood antenna pole with dishes beside two small equipment shelters on the Marys Peak ridgetop

Marys Peak Replacement Tower

Corvallis: a new 100-foot self-supporting steel tower replacing a decaying wood antenna pole on Marys Peak, taken through public land use approval and permit submittal.

The original Otter Rock communications tower in coastal fog before its replacement

Otter Rock Tower Replacement

Otter Rock: foundations for a new 150-foot tower built around a working one, so the antennas stayed on the air during the changeover.

Collapsed guyed tower hanging in the guy wires of a damaged tower above an equipment shelter near Lyons

Lyons Tower Failure and Replacement

Lyons: after a guyed tower collapsed into its neighbor, JBE planned a safe controlled demolition and permitted a single new 200-foot self-supporting tower.

Old guyed tower and new self-supporting tower standing side by side on Bald Hill near West Salem

Bald Hill Tower Replacement

West Salem: a 200-foot guyed tower with rusted-through legs replaced by a new self-supporting tower on a mat foundation we designed and then certified.

Back To Top